KCA operated, owned, and engineered projects in Bolivia from the 1990s onward — including the world's only primary chloride leach silver plant at Itos, plus the Berenguela copper-silver-manganese project that KCA purchased from the Peruvian government and developed up the value chain. Today we continue to ship modular recovery plants and pilot facilities to Bolivian operators.
Engineering, EPCM, modular plants, and equipment deliveries on record. Click any linked row for the full project case study.
| Project | Location | Operator | Year | Scope |
|---|---|---|---|---|
| Itos | Oruro / La Paz region | KCA (owner/operator) | — | World's only primary chloride leach silver plant — KCA produced 2,000,000 oz Ag/year |
| Berenguela (acquired) | — | — | — | Complex copper-silver-manganese project KCA purchased from Peruvian gov't |
| Potosí | Potosí | — | — | 150 m³/h Merrill-Crowe |
| Puquio Norte | Santa Cruz region | — | — | 370 m³/h Carbon Adsorption & Zadra Strip (1.5-Tonne) + 75 kg/hr Carbon Regeneration |
| 1 t/d CIP Pilot Plant | — | — | — | Complete cyanide CIP pilot — crushing, grinding, carbon stripping |
What KCA brings to Bolivia-specific projects beyond pure engineering capability.
Bolivian Ministry of Mining and Metallurgy permitting workflow; AAPS environmental approvals.
Potosí is 4,090 m above sea level — among the highest mining cities on earth. KCA equipment designs for Bolivian operations factor in derated motor performance, altitude-adjusted scrubbers, and high-altitude pump curves.
KCA has not only engineered for Bolivian operators — we have been a Bolivian operator. The Itos and Berenguela experience gives us first-hand operating knowledge of Bolivian regulatory, labor, and logistical realities.
Spanish-language operations manuals, drawings, and project management throughout the lifecycle.
KCA has the lab, engineering bench, and EPCM experience to deliver in Bolivia — and the local knowledge to do it efficiently.
Send an Inquiry