Plants & Equipment · Site-Built Recovery Plants
Plants & Equipment

Site-Built Recovery Plants

Custom Engineered, On-Site Constructed

Since 1972, KCA has provided lab testing, engineering, and field services for over 1,000 different gold recovery projects. Our plants have earned an outstanding reputation for quality, simplicity, ease of start-up, and fail-safe operation. KCA can provide a complete turnkey project to process your ore in the most cost-effective manner.

1,000+
Projects
20,000 ft² shop
Footprint
Engineering + EPCM
Mode

When Site-Built Makes Sense

Operations above ~4,000 TPD throughput typically justify site-built plants. Custom layouts integrate with existing infrastructure, accommodate unique ore characteristics, and scale to nameplate without modular constraints.

Featured Project: Hog Ranch Heap (Nevada)

KCA performed the project engineering and construction management for this 4,000 ton-per-day open-pit heap leach gold operation. KCA had turnkey responsibility for offices, power and utilities, and infrastructure as well as processing. The project was brought into production after only 16 weeks of construction, ahead of schedule and under budget at a capital cost of US $7.7 million. As part of initial capital installations, Hog Ranch installed 1,000,000 sq ft of PVC leach pad. KCA supplied the agglomerating drum and conveyor transport/stacking system.

Featured Project: Itos (Bolivia)

Itos is a US $17 million, 600 tonne/day agitated leach plant which recovers precious metals and base metals from previously processed flotation tailings using a complex acid leach process.

Featured Project: Ity (Ivory Coast)

The plant at Ity is typical of KCA's smaller modular plants — the carbon column adsorption/desorption circuit uses an alcohol strip in the same columns. Carbon is replaced once per year. The desorption circuit consists of a tank, heater and solution recirculation system, an electrolytic cell, and a smelting furnace to produce doré bars on site. Modular plants are fully wet-tested in Reno before shipping. Total setup time at remote sites is usually 8 weeks or less.

Featured Project: COMCO Silver — Potosi (Bolivia)

COMCO Silver is a 1,000 TPD dry-grind / heap leach project treating an oxidized silver ore. This heap leach project is unique in that the ore is fine-crushed to 8 mesh and then reduced in size by dry grinding to 20 mesh prior to agglomeration. Crushing uses a three-stage system with jaw crusher, cone crushers, and a Barmac impactor in closed circuit.

Featured Project: San Martin (Honduras)

The San Martin project of Glamis Gold Ltd. is a 15,000 tonne/day heap leach which started production in early 2001. Head grade is 0.9 grams/tonne and recovery is 73%. KCA provided the recovery plant on a complete turnkey guaranteed basis. The plant contains two trains with five carbon columns each — total combined flow is 900 m³/hr of solution (4,000 gpm). KCA also provided a separate water treatment plant. KCA's turnkey contract was about $2M of the total $27M project capital cost.

Featured Project: Puquio Norte (Bolivia)

KCA built a complete carbon stripping and regeneration module for Puquio Norte in our Reno fabrication yard. The plant was disassembled, shipped to Bolivia, and reassembled on site by KCA technicians.

Featured Project: Tambor (Guatemala)

KCA built a 200-tonne-per-day flotation process plant for the Tambor Project. Float cells and rear deck are mounted on standard shipping skids, and the rest is easily reassembled at site.

Recent Major Deliveries

Camino Rojo (ORLA Mining): 1,200 m³/h Merrill-Crowe on 18,000 TPD heap leach. Ivrindi (TÜMAD): 3,200 m³/h ADR plant on 21,100 TPD heap leach. Soledad Mountain (Golden Queen): 600 m³/h Merrill-Crowe. Los Filos (Goldcorp): ADR expanded across 7 modifications to 8,000 m³/h.

Project Gallery

From our portfolio.

Project Receipts

Site-Built Recovery Plants Delivered

A partial list of operations where KCA has fabricated on-site recovery plants.

OperationLocationTypeSize
BolkaradagTurkeyMerrill-Crowe & Agitated Leach Plant200 tons/day
DoloresMexicoComminution Circuit to Existing MC5,600 tons/day
El CastilloMexicoCarbon Adsorption1,400 m³/hr
Hog RanchUnited StatesCarbon Adsorption & Strip4,000 tons/day
HycroftUnited States5 Ton Caustic Strip5 tons/day
HycroftUnited StatesMerrill-Crowe4,772 m³/hr
ItosBoliviaAgitated Leach600 tons/day
IvrindiTurkeyCarbon Adsorption3,200 m³/hr
La ColoradaMexicoCarbon Adsorption1,300 m³/hr
La IndiaMexicoCarbon Adsorption1,400 m³/hr
Los FilosMexicoCarbon Adsorption3,600 m³/hr
Los FilosMexicoPumping Expansion4,500 m³/hr
Los FilosMexicoCarbon Adsorption Expansion900 m³/hr
MascotaMexicoCarbon Adsorption340 m³/hr
Nixon ForkUnited States1.5 Ton Zadra Strip1.5 tons/day
Ocampo Heap LeachMexicoMerrill-Crowe800 m³/hr
Ocampo MillMexicoMerrill-Crowe233 m³/hr
Pinos AltosMexicoMerrill-Crowe551 m³/hr
PotosiBoliviaMerrill-Crowe150 m³/hr
Puquio NorteBoliviaCarbon Adsorption & Zadra Strip (1.5-Tonne)370 m³/hr
Puquio NorteBoliviaCarbon Regeneration75 kg/hr
San MartinHondurasCarbon Adsorption900 m³/hr
Sao FranciscoBrazilCarbon Adsorption700 m³/hr
Soledad Heap LeachUnited StatesMerrill-Crowe660 m³/hr
South AreaUnited StatesCarbon Adsorption3,500 m³/hr
TamborGuatemalaGold Flotation200 tons/day
TambomayoPeruMerrill-Crowe1,200 m³/hr
TarkwaGhanaCarbon Adsorption/Strip w/ Hot Zn Precip700 m³/hr
Tarkwa IIGhanaCarbon Adsorption Tower230 m³/hr
500+Engineering Projects
74Modular Plants Delivered
17EPCM Contracts
30+Countries Worked
1972Founded
Recent KCA Projects

See this capability in action.

Selected recent projects where KCA delivered this service. All from our portfolio of 500+ engineering projects.

View All Projects
Common Questions

Frequently asked.

How long does a typical KCA testwork campaign take?
Bench-scale programs take 4–8 weeks; column leach campaigns 3–6 months depending on heap height and ore character; full bankable feasibility-level testwork can span 9–18 months. Every campaign begins with a metallurgical interview to set the scope, schedule, and budget against your project milestones.
Can KCA take a project from testwork through commissioning?
Yes — this is KCA's defining capability. Most EPCM firms outsource testwork; KCA self-performs the lab, engineering, and (in EPCM mode) construction management. The flowsheet you sign off on is designed by the same team that builds the plant. One handoff. Fewer surprises.
Where does KCA work geographically?
KCA's Reno, Nevada headquarters serves projects in the Americas, Asia-Pacific, and Africa. Our Chihuahua, Mexico affiliate (Kappes Cassiday del Norte) supports operations across Mexico and Central America. Our Perth, Western Australia affiliate (KCAA) serves Asia-Pacific. Over 500 projects across six continents since 1972.
What types of ore does KCA test and engineer?
Primary expertise is gold and silver — both heap leach and milling/agitated cyanide processes. We also work on copper, lithium, and base metals. The KCA lab routinely runs HPGR, gravity, flotation, cyanide, and Merrill-Crowe campaigns across all commodity classes.
More Equipment

Explore the full capability set.

Let’s talk about your project.

Whether you’re at scoping stage or ready to break ground, KCA has the lab capacity, engineering bench, and EPCM experience to deliver.