Mexico is KCA's most active jurisdiction worldwide. Since the 1990s, KCA has delivered 11+ major projects across Sonora, Chihuahua, Zacatecas, Durango, and Guerrero — including the recently commissioned $125M Camino Rojo for ORLA Mining and the 13-month La India EPCM for Agnico-Eagle. Our local subsidiary Kappes Cassiday del Norte (KCN) in Chihuahua provides on-the-ground procurement, customs, and construction-management support for every Mexico project.
Engineering, EPCM, modular plants, and equipment deliveries on record. Click any linked row for the full project case study.
| Project | Location | Operator | Year | Scope |
|---|---|---|---|---|
| Camino Rojo | Zacatecas | ORLA Mining | 2021–2022 | 18,000 TPD heap leach · 1,200 m³/h Merrill-Crowe · $125M EPCM |
| La India | Sonora | Agnico-Eagle | 2012–2013 | 17,250 TPD heap leach · 1,400 m³/h ADR · 13-month EPCM |
| Pinos Altos | Chihuahua | Agnico-Eagle | 2006–2009 | 6,000 TPD CIL + heap leach · 551 m³/h Merrill-Crowe · $134M EPCM |
| Ocampo | Chihuahua | Gammon Lake | 2004–2007 | 1,500 TPD agitated leach + 12,000 TPD heap · $104M EPCM |
| Dolores | Chihuahua | Pan American Silver | 2014–2017 | 5,600 TPD pulp agglomeration · $53M EPCM |
| Los Filos Bermejal | Guerrero | Goldcorp | Multiple | ADR · 7 expansions across 5,000–8,000 m³/h capacity range |
| Mascota | Chihuahua | Agnico-Eagle | — | 1.35 Mt/yr · 375 m³/h ADR plant |
| El Castillo | Durango | Argonaut Gold | — | 1,400 m³/h carbon adsorption circuit (site-built) |
| La Colorada | — | Pan American Silver | — | 1,300 m³/h carbon adsorption |
| El Cubo (I & II) | — | Endeavour Silver | — | 120 + 121 m³/h Merrill-Crowe (modular) |
| San Antonio · San Martin · La Sorpresa | Multiple | Multiple | — | Modular Merrill-Crowe plants (65–70 m³/h) |
What KCA brings to Mexico-specific projects beyond pure engineering capability.
SEMARNAT environmental approvals, water rights, tailings storage facility (TSF) permits. KCA engineers have walked dozens of Mexican projects through CONAGUA and federal permitting cycles.
Kappes Cassiday del Norte (KCN) operates from Chihuahua, providing local procurement, customs clearance, import/export, warehousing, and Spanish-language project management. KCN supports every KCA Mexico project from sample shipment through commissioning.
Decades of experience importing equipment to remote Mexican mine sites — Sonora, Chihuahua, Durango. KCN handles customs paperwork, freight consolidation, and on-site inventory management of spares and consumables.
Bilingual KCA-trained Mexican construction supervisors. We've delivered nine-figure EPCM packages with mixed US/Mexican labor, mixed-currency procurement, and integrated US/Mexican standards.
Familiar with NOM standards, IMSS/INFONAVIT labor requirements, and PROFEPA environmental inspections.
KCA has the lab, engineering bench, and EPCM experience to deliver in Mexico — and the local knowledge to do it efficiently.
Send an Inquiry