Brazil has been a steady KCA market for two decades, anchored by the Fazenda Nova 450 m³/h Carbon Adsorption plant and the São Francisco 700 m³/h system. KCA supports Brazilian gold operations from our Reno laboratory and engineering bench, with cross-border logistics support from KCN-Mexico.
Engineering, EPCM, modular plants, and equipment deliveries on record. Click any linked row for the full project case study.
| Project | Location | Operator | Year | Scope |
|---|---|---|---|---|
| Fazenda Nova | Goiás area | — | — | 450 m³/h Carbon Adsorption (modular) |
| São Francisco | — | — | — | 700 m³/h Carbon Adsorption (site-built) |
What KCA brings to Brazil-specific projects beyond pure engineering capability.
IBAMA (federal environmental agency) and state-level (Goiás, Minas Gerais, Pará) environmental review experience.
Cross-Atlantic procurement experience; KCA has shipped modular plants to Brazilian ports for trucking to interior mine sites.
Portuguese-language documentation and training materials available for operations manuals and equipment specifications.
KCA's Carbon Adsorption + ethanol/Zadra strip platform is well-proven for Brazilian gold operations — modular delivery, fast install, low operating cost.
KCA has the lab, engineering bench, and EPCM experience to deliver in Brazil — and the local knowledge to do it efficiently.
Send an Inquiry