Mascota is a 1.35 million-tonne-per-annum heap leach operation for Agnico Eagle Mexico. KCA supplied a 375 m³/h Adsorption Columns ADR plant with a Modified Zadra Pressure Strip Circuit — designed, fabricated, installed, and commissioned end-to-end.
KCA supplied detailed engineering, fabrication, installation and startup of the plant for the Mascota ADR recovery plant near Chihuahua, Mexico. A focused recovery-plant delivery from a long-standing repeat client.
Detailed Engineering · Fabrication · Installation
KCA has delivered 17 EPCM contracts and 74 lab projects per year across six continents. Let’s talk about your project.
Request a Call →