Heap Leach Plant Design & EPCM

KCA engineered the third heap leach in the world — 500+ projects later, we remain the heap-leach reference firm.

KCA engineered our first heap leach at Manhattan, Nevada in 1972 — only the third heap leach in the world. Five decades and 500+ projects later, the heap-leach flowsheet is still our defining capability. From bench-scale column tests through bankable feasibility, detailed design, EPCM, commissioning, and operations review — KCA covers the entire heap-leach lifecycle from one Reno facility.

1972 · Manhattan, NV
First heap leach
500+
Heap leach projects
21,100 TPD (Ivrindi)
Largest delivered
74
Modular plants delivered

Pad Design & Geotechnical

Heap pad layout, liner system specification, leak-detection design, slope stability, and stage-build sequencing. KCA designs pads for capacities from 500 TPD pilot heaps to 21,000+ TPD industrial operations.

Crushing & Agglomeration

Two- and three-stage crushing circuits, optional HPGR for finer crush sizes, and agglomeration with cement or lime to stabilize fines and improve heap permeability. Pulp-agglomeration designs (Dolores) for ultrafine ores.

Solution Application & Collection

Drip or sprinkler irrigation design, pregnant-solution collection ponds, barren-solution return systems. Engineered for the application rate matched to column-test kinetics on your specific ore.

Recovery Plant

ADR (Adsorption / Desorption / Recovery), Merrill-Crowe, or hybrid flowsheets sized to PLS flow and grade. Standardized modular packages or fully custom site-built.

Doré-Bar Production

Electrolytic cells, mercury retorts where applicable, tilting-crucible smelting furnaces (3 KCA models: 225T / 430T / 800T), matched scrubbers, and gold-room layouts that meet US, Mexican, Turkish, and Australian regulatory limits.

Cyanide Destruction & Closure

INCO SO₂/air or peroxide cyanide-destruction circuits. Tailings dewatering. Closure planning consistent with permit conditions and post-closure water-treatment requirements.

Reference Projects

Where KCA has deployed this.

Related Capabilities

Build on the rest of the KCA stack.

Project in this space?

Talk to the right team.

Send the project details and we’ll route to the engineering lead who has done this before.

Send an Inquiry