Engineering & EPCM

Pioneers in Precious Metals Heap Leaching · Since 1972

KCA is one of the pioneering firms in precious metals heap leaching. Our first U.S. project at Manhattan, Nevada in 1972 was only the third heap leach in the world. We have since delivered 500+ engineering projects, 17 EPCM contracts, and 74 modular plants across six continents.

17
EPCM projects
500+
Engineering projects
74
Plants delivered
1972
Founded

Engineering Studies

KCA can provide basic concept studies to guide your exploration efforts. As the project matures, we provide studies up through bankable feasibility, into detailed design and construction. KCA bankable studies have an admirable track record for securing financing.

Preliminary Economic Assessment (PEA) — ±40% capex
Pre-Feasibility Study (PFS) — ±25% capex
Feasibility Study (FS) — ±15% capex (bankable)

In-House Design Team

KCA has a complete in-house design team to bring flowsheets to life — creating efficient, practical plants to fit project needs. With LiDAR scanning, our design team can accurately retrofit or design expansions for existing plants.

• New Plant Design
• Plant Expansions
• Operating Plant Retrofitting

Operations Review

All KCA engineers travel extensively and are continuously exposed to a wide variety of operating problems and solutions. The review of operations is a major aspect of what we do.

• Heap Leach Operations Review
• Crusher Operations
• Mill Operations
• Metal Inventory Review

Performance audits of a heap leach project are difficult because heap leach recovery rates depend on many operational factors. KCA has the experience to identify the real drivers.

Historic Project: Hog Ranch Heap Leach

KCA designed, engineered, and was the general contractor on the Hog Ranch, Nevada 4,000 tonnes/day heap leach. KCA provided all process installations and infrastructure at this remote site — including man-camp, water and power supply systems. Hog Ranch was built at a total cost of $7.7M and was producing gold within 16 weeks of starting construction.

EPCM Track Record

17 turn-key EPCM projects delivered including:
Camino Rojo — ORLA Mining, $125M, 2021–2022
Pinos Altos — Agnico-Eagle, $134M, 2006–2009
Ocampo — Gammon Lake, $104M, 2004–2007
La India — Agnico-Eagle, 13-month EPCM, 2012–2013

Turnkey Capability

KCA can provide a complete turnkey project to process your ore in the most cost-effective manner. Why hire your own staff? We maintain personnel with peak technical skills, fully supported by our experienced management team. We can handle your project from laboratory testing through gold production. We work throughout the world from our offices in Nevada, Australia, and Mexico.

Project Gallery

From our portfolio.

500+Engineering Projects
74Modular Plants Delivered
17EPCM Contracts
30+Countries Worked
1972Founded
Recent KCA Projects

See this capability in action.

Selected recent projects where KCA delivered this service. All from our portfolio of 500+ engineering projects.

View All Projects
Common Questions

Frequently asked.

How long does a typical KCA testwork campaign take?
Bench-scale programs take 4–8 weeks; column leach campaigns 3–6 months depending on heap height and ore character; full bankable feasibility-level testwork can span 9–18 months. Every campaign begins with a metallurgical interview to set the scope, schedule, and budget against your project milestones.
Can KCA take a project from testwork through commissioning?
Yes — this is KCA's defining capability. Most EPCM firms outsource testwork; KCA self-performs the lab, engineering, and (in EPCM mode) construction management. The flowsheet you sign off on is designed by the same team that builds the plant. One handoff. Fewer surprises.
Where does KCA work geographically?
KCA's Reno, Nevada headquarters serves projects in the Americas, Asia-Pacific, and Africa. Our Chihuahua, Mexico affiliate (Kappes Cassiday del Norte) supports operations across Mexico and Central America. Our Perth, Western Australia affiliate (KCAA) serves Asia-Pacific. Over 500 projects across six continents since 1972.
What types of ore does KCA test and engineer?
Primary expertise is gold and silver — both heap leach and milling/agitated cyanide processes. We also work on copper, lithium, and base metals. The KCA lab routinely runs HPGR, gravity, flotation, cyanide, and Merrill-Crowe campaigns across all commodity classes.
More Services

Explore the full capability set.

Let’s talk about your project.

Whether you’re at scoping stage or ready to break ground, KCA has the lab capacity, engineering bench, and EPCM experience to deliver.