Zinc-precipitation recovery for silver-rich and high-tenor solutions — from 30 m³/h modular to 4,772 m³/h site-built.

Merrill-Crowe is the recovery technology of choice when ore is silver-dominant or when leach-solution grades are too high for economic carbon adsorption. KCA has designed Merrill-Crowe plants from 30 m³/h modular units (Aurex, Peru) to the 4,772 m³/h Hycroft site-built circuit — and the recently commissioned 1,200 m³/h Camino Rojo Merrill-Crowe for ORLA Mining is among the largest in North America.

30 m³/h (Aurex, Peru)
Smallest delivered
4,772 m³/h (Hycroft)
Largest delivered
1,200 m³/h (Camino Rojo, 2022)
Most recent major
Modular or Site-Built
Configuration

Clarification

Pre-clarification removes suspended solids that would otherwise interfere with zinc precipitation. KCA designs pressure-leaf clarifiers, deep-bed filters, or vacuum drum filters depending on solution character and throughput.

Vacuum Deaeration

Critical step — dissolved oxygen passivates zinc dust and kills recovery. KCA deaeration towers achieve <1 ppm O₂ at design flow, with packed-tower designs optimized for the specific solution density and viscosity.

Zinc Precipitation

Zinc-dust feeders and reaction mixers sized to gold + silver tenor. KCA also designs lead-nitrate addition systems for refractory silver solutions where additional activation is needed.

Precipitate Filtration

Plate-and-frame filter presses to dewater the zinc-gold-silver precipitate cake. Filter sizing matched to gold + silver tenor and operating schedule.

Smelting & Refining

Mercury retort (if needed for Hg-bearing concentrates), tilting-crucible smelting furnace, and matched off-gas scrubbing for SO₂ / NOₓ / particulate control. KCA Models 225T / 430T / 800T.

Reference Installations

Camino Rojo (Mexico) · Hycroft (Nevada) · Tambomayo (Peru) · Potosí (Bolivia) · Soledad Mountain (California) · Pinos Altos · El Cubo · San Antonio · multiple others.

Reference Projects

Where KCA has deployed this.

Related Capabilities

Build on the rest of the KCA stack.

Project in this space?

Talk to the right team.

Send the project details and we’ll route to the engineering lead who has done this before.

Send an Inquiry